Built on trust,delivered as promised.
Steel and RCC, high-rise, tunnel and heritage works across Pune, since 2011.
- Since 2011Established
- 350+ in-house labourIn-house labour
- 18 L+ sq.ft under executionUnder execution
Civil and structural contractors, building on our own plant, people and technology.
- Years building across Maharashtra
- 14+
- Residential buildings delivered
- 22+
- Lock-and-key bungalows handed over
- 27+
7 locations across Maharashtra and Goa
- Pune
- Pimpri-Chinchwad
- Navi Mumbai
- Kolhapur
- Goa
- Pandharpur
- Virar, Mumbai
Most structures don’t fail.They slip.
Usually: You see progress once a month.
How we run it: A progress report from site every evening.
Signed off on site every evening
Usually: The programme is a guess.
How we run it: A programme that is computed.
Pours sequenced by AI
Usually: The crane is in a hire queue.
How we run it: Our own plant and our own people.
Cranes we own, crews on our own rolls
Usually: Vendor bills never reconcile.
How we run it: One portal for every vendor and gang.
Rate contracts, GRNs and bills in one place
What we build.
- Steel and RCC constructionStructural frames in steel and reinforced concrete, built to IS code from raft to roof.
- High-rise constructionTowers planned around the core, the crane and a repeatable floor cycle.
- Tunnel constructionCut-and-cover boxes, portals, linings and crossings, kept dry and true to line.
- Government and heritageHeritage works executed for the Directorate of Archaeology and Museums, Government of Maharashtra.
Engineering Mastery
Get the structure right, and everything else follows.
- Buildings delivered
- 49+
- Sq.ft under execution
- 18 L+
- Own tower cranes, plus one movable
- 2 + 1
350+In-house labour on our own rolls
People First
Zero major accidents in 13 years is not luck. It is culture.
- 40% Carpenters
- 30% Steel fitters
- 30% Unskilled
- Major accidents in 13 years
- 0
- Professionals on site and in office
- 75+
- PPE checked at the gate
- 100%
Execution Excellence
On programme, on quality, and fully visible every day.
- Pre-construction
- Planning
- Mobilisation
- Execution
- Control
- Handover
17:45Every evening, the daily progress report reaches the client.
15thRA bill submitted, every month.
Landmarks across Pune and Maharashtra.
August Tower
Tejalkunj
Kohinoor HO ProjectArtist's impression
Isle of Life
SRA Project
Bramha Int’l School
Gangadham Tower, C-Wing
Radiance
Vitthal-Rukmini Devasthan
Sixteen times, in four years.
Turnover, ₹ in crores. FY 2025–26 is projected.
- ₹4.8 CrFY 21–22Actual
- ₹13.15 CrFY 22–23Actual
- ₹45.51 CrFY 23–24Actual
- ₹77 CrFY 24–25Actual
- ₹125 CrFY 25–26Projected
Clients and partners we build for.
Developers and institutions across Pune, Navi Mumbai and Mumbai who have trusted us with their structures.
- Bramha Corp.
- Puravankara
- Kohinoor Group
- Abhinav Group
- Gokhale Landmark
- Savani Heritage
- Raviraj Associates
- Shreedhar Associates
- R R Ventures
- Contigo Eduworld
Questions developers ask.
Short answers on scope, safety, plant and pricing.
Talk to Rajat Kate, +91 77438 51234How we work, from design check to handoverWho is Grey Infra Associates?
Grey Infra Associates is a civil and structural contractor founded in Pune in 2011. We build steel and RCC buildings, high-rise towers, tunnel works, and government and heritage projects. We work with our own plant, 350+ in-house labour and 75+ white-collar professionals. Our head office is in Pimple Saudagar, Pune.
Where does Grey Infra Associates work?
We work across Maharashtra and Goa from 7 locations: Pune, Pimpri-Chinchwad, Navi Mumbai, Kolhapur, Goa, Pandharpur and Virar, Mumbai. Our clients are developers and institutions across Pune, Navi Mumbai and Mumbai. The head office is at Govind Asterra, Pimple Saudagar, Pune 411 027.
How big is Grey Infra Associates?
Turnover was ₹77 Cr in FY 2024–25 (actual), up from ₹4.8 Cr in FY 2021–22. It is projected at ₹125 Cr for FY 2025–26. We have 350+ labour on our own rolls, 75+ white-collar professionals and 18 lakh+ sq.ft of built-up area under execution.
Do you own your plant and machinery?
Yes, our core plant is on our own books. It includes 2 tower cranes and 1 movable tower crane, 25+ concrete plant units, 3,600 m² of Mivan formwork, 1,150 MT of cup-lock props and 2,000 scaffolding H-frames. Owned plant lets us mobilise in days, and pour dates hold when rental markets are tight.
What is your safety record?
We have had zero major accidents in 13 years. PPE is checked at the gate for every worker, toolbox talks run before work every day, and a full-shift safety officer is on site. Trained safety stewards and height-work permits back this up, and every daily DPR reports safety status.
How do I get a quote?
Send us your structural drawings, the BOQ for the package and the site location. We come back with a priced BOQ, a clear scope and a day-wise programme. Call Rajat Kate on +91 77438 51234 or Nityanand Yewale on +91 77200 58511, or email connect.greyinfra@gmail.com.
How will I track progress on my project?
You get a daily progress report (DPR) by 17:45 every working day. It covers labour, materials, machinery, work fronts and safety, signed off by the site engineer, QA/QC and project manager. A client dashboard updates every evening, and the project manager reviews progress with you weekly.
Send your drawings and BOQ.
We’ll come back with a priced BOQ, a clear scope and a day-wise programme.
Email your drawings